Hat Creek Diversion & Step-Pool Project

Step-pool system built with local rock. 5 step series with less than 1.0-ft drop per step.

Diversion structure showing relationship of sluice gate (left) to diversion gate (right).

Step-pools created using cross-vane specifications derived from Wildland Hydrology design criteria.

Diversion structure situated along right bank. Typical operation requires only one gate open at a time. If diversion flow is closed, sluice gate should be open to allow for sediment passage.