Hat Creek Diversion & Step-Pool Project

PXL_20251111_180511975.jpg

Step-pool system built with local rock.  5 step series with less than 1.0-ft drop per step.

PXL_20251111_180426274.MP.jpg

Diversion structure showing relationship of sluice gate (left) to diversion gate (right).

PXL_20251111_180433871.MP.jpg

Step-pools created using cross-vane specifications derived from Wildland Hydrology design criteria.

PXL_20251115_175851292.jpg

Diversion structure situated along right bank. Typical operation requires only one gate open at a time.  If diversion flow is closed, sluice gate should be open to allow for sediment passage.