Unstable reach of main Lynch Creek channel.
Initial survey of channel cross-sections.
Tower Rd. culvert prior to dissipation pool project.
Rock dissipation pool below Tower Rd. crossing.
Rock crossing construction along main access road.
Rock cross-vanes constructed below Lynch Rd. culverts to step flows down to lower elevation.
Show More

Lynch Canyon Open Space Project  2011-2018

This site was designed with the
.com
website builder. Create your website today.
Start Now